Suppose a ROM pad has 500,000 tonnes of ore averaging 0.82% Cu. On the surface, this would seem a straightforward blend target. However, around 30% of the pad is 0.45% and a further 20% exceeds 1.1%. Moreover, there is a section towards one end of the pad containing a type of ore which is slower to grind than any seen in the mill this quarter.
Whilst the average doesn’t reflect this, the mill (often on the overnight shift) soon becomes aware of these differences. To some extent, this scenario is common. Although blends are often designed around an average value, the plant adapts behind the scenes. Ore blending optimization aims to bridge this difference pre-crushing.
But the average was never the aim
Despite advances, blending is still generally based on individual stockpile values. For example, 60% is taken from stockpile A and 40% from stockpile B to achieve a desired blend grade. Whilst a blend may appear well balanced in a spreadsheet, physical blends can be very uneven. Factors such as ore hardness, clay content, moisture and penalty elements (for instance, arsenic) all differ from grade and in turn impact plant operation.
NTWIST explored this in greater depth in Average Grade is the Most Misleading Metric in Mining. Basically, the averaging process actively disregards the information a good blend design should utilise.
Testwork
Generally, less than 5% of an orebody is tested metallurgically. Therefore, it is common for a plant to be optimised for an ore type which has not been widely analysed.
Impact of feed grade variability
Whilst usually not catastrophic, feed grade variability will cause a series of minor, reactive adjustments. As the ore differs from plan, so too does reagent addition. Consequently, for a period of hours, plant recovery is affected. Eventually, staff become reactive and add reagents purely as a precaution, despite no conscious decision being made to do so. In turn, reagent expenditure increases. Although nothing appears particularly severe in monthly reporting, value is nonetheless being lost.
Don’t view the ROM pad as one value
NTWIST’s first recommendation is always to do this. Using its MineMax software, NTWIST converts ROM pad average values into block-level visualisations. These can be generated at 1x1m to 20x20m. They are created using information already commonly available at sites, including grade control, lithology, hardness, truck data, pad survey data, reclaim data and mill weightometer data. Additional instrumentation is not required.
On long-term stockpiles, OreMax typically reduces block-level grade variability by 30-50%. This provides a sound basis for blending. Furthermore, enhanced visualisations also reveal previously unknown ore. At a Brazilian open-pit gold mine, OreMax identified approximately 100kt of medium- and high-grade ore within a low-grade stockpile. This was valued at around US$11M. At the same mine, the misdistribution of high-grade ore to waste was reduced by up to 98%.
For a detailed explanation of how material is traced from face to mill, please see the NTWIST blog on ore tracking and mine-to-mill performance.
Predict. Then blend.
Following pad visualisation, accurate prediction is achievable. Using DynaMax, NTWIST can predict mill feed 1-7 days ahead, with associated levels of confidence. MineMax as a whole achieves production and material flow predictions of up to 95% accuracy.
Whilst many appreciate the importance of accurate predictions, even greater value can be derived from the associated levels of confidence. Knowing that grade is likely to fall within a range (for example, 0.74-0.91% with 90% confidence) greatly aids planning, compared to simply knowing it will be 0.82%.
Ore blending in mining therefore evolves from a static blend to a dynamic, regularly reviewed process. PlanMax enables planners to explore alternative blends in line with mining, ROM pad and plant restrictions. Planning can occur prior to any trucks departing. ROM pad blending is no longer purely a matter of finding the nearest finger and taking from there.
As the plant is able to anticipate incoming feed, MillMax can proactively amend plant settings.
One gold and copper mining operation supported by NTWIST converted to stockpile feeding. NTWIST developed a probabilistic visualisation providing each stockpile block with a grade and a level of confidence. Copper and gold site grade predictions were achieved within 1.7% and 0.7% respectively. This provided a strong basis upon which to conduct informed, risk-aware blending.
Benefits
At a 100koz/year gold mine, DynaMax and MillMax predicted feed variability and its impact on recovery. Reagent addition was also proactively modified. As a consequence, recovery improved by 1.6%+. Reagent expenditure was reduced by up to 30%. Importantly, no modifications were required to the downstream plant. Recovery enhancement alone equated to around US$2M in annual benefit.
In total, across NTWIST’s mining projects, MineMax has delivered $35M+ of annual value. Typically, sites understand their material flows within 90 days and achieve payback within 45 days of initial production.
Alongside blending, there are further stages to optimising mine to mill. Please see the NTWIST blog on fixing mine-to-mill breakdowns for further details.
How to begin with ore blending optimization
No additional instrumentation is needed, and there is no requirement to shut down the plant. Initial mill feed optimization can be based on existing data held within a site’s block model, dispatch and plant historian systems.
Input your site’s data into the NTWIST Mining ROI Calculator or arrange a Clarity Call with NTWIST’s mining experts, who will then highlight areas of value loss in your present blending approach.
Frequently Asked Questions
What is ore blending optimization?
This is where ore is combined from various stockpiles, benches or ROM pad sections to ensure a steady mill feed. Good ore blending involves optimising not just grade but also hardness, clay and penalty elements. Predictive information is used to determine the likely characteristics of each feed source.
Why shouldn’t you base your blend on average grade?
As noted above, an average conceals underlying variability. Even if a ROM pad has an average grade of 0.82% Cu, there will frequently be both much higher- and lower-grade ore, alongside differing hardness. As an average fails to recognise this, the plant incurs avoidable losses in recovery and reagent expenditure.
How does feed grade variability influence recovery?
Should feed grade change quicker than the plant can react, reagent and grind settings will become misaligned with the ore. This in turn affects recovery. For example, at a 100koz/year gold mine, predictive feed analysis enabled proactive reagent modification. Recovery was enhanced by 1.6%+ as a result.
What is ROM pad blending?
This is where ore is reclaimed from several parts of a ROM pad to formulate a desired mill feed. Block-level visualisations are especially effective for this as they illustrate local grade and hardness, rather than just a pad-wide average value.
How far in advance can mill feed be predicted?
MineMax can predict mill feed 1-7 days in advance, again with confidence levels. Production and material flow predictions achieve up to 95% accuracy. This allows plant personnel and metallurgists to modify blends and plant settings accordingly.
Is specialist instrumentation or equipment needed to optimise ore blending?
Typically not. MineMax utilises information routinely gathered by mines such as block models, dispatch data, stockpile surveys, assays and plant historian data. For the majority of operations, material flows are understood within 90 days.
About the Author
Pramodh Chandrashekar is the Marketing Manager at NTWIST, where he leads content and communications for the company's mining and manufacturing work. He writes about how industrial AI is used in mine-to-mill operations and production planning, drawing on NTWIST's deployment results and its engineering and sales teams.
He is a three-time TEDx speaker and is known in India's green entrepreneurship space. A lawyer by training with a BBA LLB (Hons.) degree, he also wrote Bleeding Markets, a beginner-friendly book on finance.
LinkedIn: Pramodh Chandrashekar