Generates granular (high-resolution) maps of ROM pad inventory
DynaMax replaces ROM pad averages with block-level precision and short-term feed forecasts
to reduce surprises, improve feed consistency, and stabilize plant performance.
Provides data for accurate and confident feed/blend planning
Generates short-term reclamation scenarios with feed forecasts for the plant as a heads-up
What’s Broken Today?
ROM Pad Variability Is Averaged Out
ROM pads are managed using bulk averages, masking critical variability that impacts recovery and throughput.
The Plant Can’t See Feed Quality
Key feed properties rarely reach the plant in time to adjust control settings.
Lost Production, Higher Reagent & Energy Costs
The result is production losses and higher reagent and energy consumption.
How DynaMax Works
From raw data to actionable stockpile truth

1. Inputs
Required Data Sources. DynaMax works with data you already have:
- Resource & Grade Control Models: Grade, lithology, hardness, proxies, geomet variables
- Ore Movement Records: Time, origin, and destination data
- ROM pad surveys: surface/volumes
- Reclamation activity logs
- Mill weightometer data
2. Outputs
What Users Receive:
- ROM pad inventory model
- What-if scenario based forecasts
How often it updates:
-
The software supports both low-frequency (shift by shift) and high-frequency (near real-time) updates workflows.

The Deployment Workflow

Configure
ROM pad areas and map variables in different datasets
Upload
data manually or connect to data sources
Generate
block-level ROM pad inventories
Run
what-if reclamation scenarios
Optionally
Send real-time grade to the plant
Top KPIs Impacted
1x1 to 20x20 m
ROM pad model granularity
30-80%
reduction in average feed predictability error
0.5–2%
recovery improvement
(from better feed planning and plant operation)

Case Story
Unlocking $2M/Year in Added Value
A 100 koz gold mine implemented DynaMax to replace ROM-pad averages with block-level precision and short-term forecasts. With more accurate feed forecasting and blending, the operation stabilized plant performance, optimized throughput, and delivered a measurable uplift in recovery.
- 1.6% Recovery gain from improved feed forecasting and blending
- US$2M/year Increase in annual value from optimized throughput and plant performance
Ready for Block-Level ROM Pad Forecasts?
Request a walkthrough to explore how DynaMax gives you real-time, block-level ROM pad inventories and short-term forecasts.
