Nexus iMES
The Intelligence Layer that Orchestrates Manufacturing Operations
From ERP work orders to shop-floor execution—Nexus connects data, models constraints, optimizes schedules, and learns from reality.
Core Capabilities
Four integrated capabilities that transform manufacturing operations from reactive to predictive

Trusted Scheduling & Rescheduling
Publish schedules you can trust—and adapt them in minutes when reality changes
- Constraint-aware scheduling (machines, people, tooling, routings)
- Priority + due-date orchestration (OTD-first planning)
- Fast reschedule for disruptions (machine down, rush orders, labor gaps)
- Dependency and sequence handling (operation order, outsource steps)
- Schedule versioning (draft vs published)
Inputs
Work orders, due dates, routings/ops, machine capabilities, labor availability, basic inventory readiness
Outputs
Gantt schedule, dispatch list, risk flags (late/at-risk), schedule adherence targets
KPIs Impacted
OTD/OTIF, lead time, throughput, expedites, schedule adherence
Shop-Floor Execution & Visibility (iMES)
Close the loop between plan and reality with operator updates and real-time status
- Operator task screens designed for station-based workflows
- Start, pause, and complete actions with reason codes
- Issue capture for blocking constraints, quality holds, and missing material
- Real-time status propagation back to planning
- Alerts for late or blocked work

Inputs
Published schedule, task instructions, and workstation or resource assignments.
Outputs
Live task status, delay reasons, execution timeline, and exception alerts.
KPIs Impacted
Schedule adherence, WIP aging, downtime impact, labor utilization, and rework drivers.

Master Data & Constraint Management (MDM)
Make constraints explicit, editable, and validated—so schedules stay correct as operations evolve
- Part–operation sequences and standard times
- Machine capability mapping + preferred resources
- Operator skill/certification + shift availability
- Tooling/fixture constraints (renewable resource limits)
- Validation checks and discrepancy reporting
Inputs
ERP item master, routings/BOMs, HR/shift data, tooling lists (as available)
Outputs
Governed resource/route model, constraint completeness scores, discrepancy packs
KPIs Impacted
Schedule trust, planner rework hours, execution errors, rework
KPIs, Bottlenecks & Operational Insights
Turn schedule + execution data into action: bottlenecks, root causes, and KPI movement
- KPI dashboards (delivery, throughput, WIP, adherence)
- Bottleneck identification by workcenter/product family
- Delay attribution (materials vs labor vs machine vs priority changes)
- Trend reporting and operational cadence

Inputs
Schedule history, execution events, downtime reasons, work order outcomes
Outputs
KPI tiles + drilldowns, bottleneck reports, exception summaries
KPIs Impacted
Lead time, OTD, throughput, WIP, expedite reduction
How It Works
Five steps to transform your manufacturing operations
Connect
Connect data from ERP/MES/spreadsheets and shop-floor signals
Model
Model constraints (routings, resources, skills, tooling, dependencies) and validate completeness
Optimize
Optimize schedules against objectives (OTD, throughput, cost tradeoffs) and publish plans
Execute
Execute + monitor with operator/machine updates and exception alerts
Learn
Learn + improve by updating cycle times/constraints from actual performance and iterating
Integrations & Security
Connect seamlessly with your existing systems while maintaining enterprise-grade security

ERP / MES / OT Systems
Microsoft Dynamics 365, SAP, NetSuite, Infor, and Epicor, integrated via APIs, data exports, or direct database connections.
Plex and other MES platforms supported through API-based integrations and reconciliation patterns.
OPC UA, MTConnect, and edge gateways where machine-level signals are available.

Security & Compliance
Role-Based Access Control
Granular permissions by user role and department
Encryption
TLS in transit and encryption at rest for all data
Audit Logs
Complete tracking of schedule and master data changes
Flexible Deployment
Cloud, hybrid, or on-premises to align with IT policies
API & Connector Architecture
Connector-First Approach
Nexus ingests work orders, routings, inventory readiness, and execution updates through APIs or scheduled exports.
Validation Built-In
Discrepancy checks highlight missing operations, mismatched statuses, and relationship gaps before they break schedules.
Implementation
Structured deployment with clear milestones and fast time to value
Weeks 0-4
Data Readiness + Trusted Schedule MVP
Core routings and constraints with the first schedule publish.
Weeks 4-8
Execution Loop
Operator updates, exception alerts, and adherence tracking.
Weeks 8-12
Expansion
Additional lines and sites, deeper constraint modeling, KPI cadence, and continuous improvement.
What You Need to Provide
Work order feed including IDs, due dates, quantities, and priorities
Routings and operations with standard times, or historical production data to learn them
Machine list with capabilities, and operator list with shifts and skills (as available)
Inventory and material readiness signals, even a simple state machine to start
Operational rules such as outsourcing steps, changeover logic, and dispatching preferences
Time to First Value
30 Days To a first trusted scheduling loop, assuming minimum viable data is available.
Faster if routings and resources are clean; slower if master data relationships must be rebuilt.
Proven results
Real impact from manufacturing operations using Nexus
~29%
Capacity increase
Observed capacity improvement in a discrete manufacturing context through constraint-aware scheduling and optimized resource allocation.
20-30%
Cycle Time Reduction
Typical improvement range in total cycle time once constraints and execution loop are in place, with 10-15% improvement on fulfillment
Faster
Planner Efficiency
Fewer manual schedule rebuilds and faster reaction to disruptions through constraint-aware rescheduling and automated conflict resolution
See Nexus in Action
Walk through scheduling, execution, and KPI impact in 20 minutes—using your
reality (constraints), not a generic toy example
