Skip to content
An operations manager in a white hard hat reviews a large plant layout blueprint outside an industrial facility with multiple metal silos. The image suggests planning, assessment, and consideration of plant expansion or optimization.        Ask ChatGPT
Manufacturing AI & Optimization Article

Stop Expanding. Start Optimizing Your Plant.

NTWIST |
Stop Expanding. Start Optimizing Your Plant.
4:13

Before You Expand, Optimize: Are You Actually at Capacity?

Manufacturers often mistake being busy for being full. If your plant feels maxed out and expansion is on the table, pause. There’s a good chance you’re not truly at capacity, you’re just operating inefficiently.

Too many plants invest in new equipment, floorspace, or headcount without first unlocking the potential in what they already own. The result? Bloated costs, underused assets, and avoidable capital expenditures.


The Illusion of Being "At Capacity"

Just because your machines are running doesn’t mean they’re running efficiently. According to Curzon Consulting, most manufacturing plants operate at only 60–80% of their real capacity, leaving millions of dollars in throughput on the table (Curzon Consulting, n.d.).

The reasons aren’t always obvious. Idle time between jobs. Long, inconsistent changeovers. Poor sequencing. Workarounds that have become habits. These small inefficiencies add up, and over time they create a distorted sense of constraint.


Where Capacity Hides

  • Changeovers and Setups: Frequent, unoptimized changeovers can silently eat away at valuable production hours.
  • Unbalanced Workloads: While one machine runs overtime, another sits idle because sequencing was done manually.
  • Reactive Scheduling: When schedules are built in Excel or buried in static ERP modules, they can’t adapt to real-time events. Planners are constantly firefighting, not optimizing.
  • Underused Labor or Shifts: Teams may be busy, but not aligned to where constraints actually exist.

These are not failures of effort. They're failures of visibility and process. The cost is often masked until expansion feels like the only option.


Why Expansion Might Be Premature

According to The Powers Company, poor capacity utilization doesn’t just hurt productivity. It inflates unit cost and erodes margins across the board. When fixed costs (labor, equipment, utilities) are spread over fewer actual units, profitability suffers (The Powers Company, n.d.).

Worse, when leadership allocates capital toward new assets without addressing process gaps, they layer new inefficiencies onto old ones. That’s how costs grow without performance improving.


What Optimization Looks Like

Before you purchase anything, consider the following steps:

1. Map Actual vs. Theoretical Capacity

Quantify your true potential throughput based on machine capability, not just current schedules. Identify where the biggest drop-offs happen.

2. Streamline Changeovers

Reducing setup time by just 20% can unlock hours of capacity each week. Standardize procedures and align production sequences to minimize switchovers.

3. Implement Dynamic Scheduling

Move away from static spreadsheets. A dynamic scheduling engine can adjust plans in real time, rebalancing workload and revealing opportunities to maximize throughput.

4. Empower Planners

Give schedulers tools that surface the best path forward—not just software that locks them into outdated plans. This shift turns scheduling from reactive to strategic.


Real-World Impact: From "Full" to Focused

A manufacturer we worked with believed they needed a second production line due to constant delays and overrun schedules. But once we evaluated their planning process, it became clear that valuable capacity was being lost to inefficient sequencing and reactive scheduling.

By transitioning to dynamic scheduling and aligning production flow to actual demand and resource constraints, they unlocked enough capacity to meet growth targets without adding new equipment or headcount.

The capital expansion plan was shelved, and operations became more predictable, cost-efficient, and agile.


Conclusion: Stop Planning for More. Start Optimizing What You Have

Expansion isn’t always the wrong move. But it should never be the first. When your current plant isn’t running at its best, adding more complexity only compounds the problem.

If you want a clearer picture of your true capacity and how to unlock it without spending millions, we’d love to show you what’s possible.

Request a Demo

References

Curzon Consulting. (n.d.). Unlocking Hidden Capacity in Manufacturing. Retrieved from https://www.curzonconsulting.com/unlock-hidden-capacity-manufacturing

The Powers Company. (n.d.). Top 10 Issues Caused by Ignoring Capacity Utilization in Manufacturing. Retrieved from https://www.thepowerscompany.com/resources/capacity-utilization

Share this post