Often the problems for job shops occur even before the first shift has fully started. Two orders have been released for the same mill and one is to be held. However, nobody has incorrectly entered any information. And indeed the release was based on the ERP’s MRP functionality, which never assessed availability for that mill. Typically, finite capacity scheduling is applied to resolve such issues. And often, plants discover that they have under-used machine capacity.

So What Is Finite Capacity Scheduling?

This type of scheduling takes account of a plant’s true capacity. As well as a machine only ever being able to process one job at a time, a five-axis machine operator cannot also be a press brake operator. Jobs are only released when materials and tooling are available. Consequently, the start times on the schedule are highly likely to be achievable. This seems obvious and for the most part is. Yet still, the majority of ERP and MRP systems do not apply this type of scheduling as they were never designed to.

Why MRP Schedules Often Diverge from Reality

Whilst MRP was designed for procurement, it continues to perform this function effectively. Working backwards from a required date, it subtracts typical lead times and advises on what and when to procure. Within this calculation it presumes that there is always capacity within each work centre. Capacity is therefore considered to be infinite. This is fine for deciding when to procure bar stock. But issues arise when this output is then utilised to create a shift schedule. One high mix OEM in Mexico discovered that of its 57 machines, 32 had been double allocated on the ERP release. On-time delivery fell below 14%. Few of those on the floor trusted the ERP’s dates.

Issues quickly become apparent. Despite knowing that a particular machine can only process one job at a time, MRP is happy to allocate two jobs to it as if it can do so. It also applies a single set-up time to all jobs. Whereas the set up for two like items may only require a couple of minutes, a complete tool change can take half a shift. Further, orders are released irrespective of whether materials are available. Problems most often come to light when an operator heads to a machine and discovers that it is already engaged.

How a Finite Capacity Schedule Is Created

Whilst not particularly high tech, a finite capacity schedule is created using work orders and routings extracted from an ERP. The scheduler then fills in additional information; predominantly relating to machine and operator skills. Jobs are then sequenced together according to similarity in order to limit set up time. Priority is also given to ensuring that rush orders are not pushed down the schedule. Should there be an issue such as a spindle failure on second shift or a supplier delay of a day, a revised schedule can swiftly be developed. Staff can even identify in advance which orders will be affected, before having to inform customers. Although advanced planning and scheduling (APS) solutions promised such functionality several years ago, modern APS solutions also analyse past production data to accurately establish average cycle and set up times. They are not reliant on standard figures which often remain unreviewed since the original routings were prepared.

Not all plants require finite capacity scheduling. Those that produce only a small range of SKUs on dedicated lines can likely continue to rely upon MRP for many years. It also depends upon routings and machine information being broadly correct. Although poor master data is generally not a deal breaker for initial trials, it is usually soon highlighted. Finite capacity scheduling is, however, particularly beneficial for high mix operations, especially where machines are shared and frequent change-overs are required.

Indicators That a Plant Has Outgrown MRP Scheduling

According to NTWIST, between 50% and 70% of manufacturers still base their production planning on ERP outputs and spreadsheets. Within these businesses, similar indicators typically emerge. Staff often have to manually revise the schedule two or three times a week. In practice, the white board by a supervisor’s desk becomes the real schedule. Simultaneously, OTIF remains trapped in a 70-80% range and overtime levels continue to rise. Moreover, there is almost always an under-used machine, either awaiting set up staff or components still in receiving.

Existing Capacity

Typically, before new machinery is approved, it is more cost effective to initially assess capacity through sequencing. A multi-line food producer that implemented constraint aware scheduling improved OTIF to in excess of 95% within less than 2 months. Furthermore, it increased throughput from existing lines by up to 29%. Similarly, at the Mexico OEM, its newly viable schedule enabled it to process 46% more jobs. On-time delivery more than doubled. Neither business invested in new equipment. NTWIST’s article Stop Expanding. Start Optimizing Your Plant. explores why optimising sequencing should often take precedence over capital expenditure.

Role of Nexus iMES

Nexus iMES acts as a constraint aware scheduling interface between a plant’s ERP and shop floor. It analyses work orders from the ERP and represents a plant’s actual capacity. Wherever alterations occur, a revised schedule is generated. Again, the ERP remains the official source of information and does not require amendment. Typically, plants begin by testing finite capacity scheduling on one line or cell and then roll-out. For those wishing to better understand how scheduling interacts with both ERP and MES, a good starting point is Understanding the Manufacturing Software Landscape. And for those already researching Manufacturing Production Planning Software, the article Manufacturing Production Planning Software: Everything You Need to Know will prove valuable. To view how Nexus iMES creates schedules in relation to a plant’s genuine constraints, Book a Demo Call. Alternatively, begin by using the Manufacturing ROI Calculator.

Book a Demo Call

FAQ

What is finite capacity scheduling?

This is a production planning method which takes into account a plant’s true capacity. Neither machines nor personnel are allocated more work than they can manage within a defined period.

How does finite capacity scheduling differ from infinite capacity scheduling?

Whilst most MRP systems apply infinite scheduling, which presumes continual capacity availability within work centres, finite capacity scheduling only allocates work where capacity exists. A schedule can thus be practically implemented.

Does finite capacity scheduling supersede an ERP?

No. Nexus iMES operates in conjunction with an ERP. It analyses work orders and routings from within it but does not amend these.

About the Author

Pramodh Chandrashekar is the Marketing Manager at NTWIST, where he leads content and communications for the company's mining and manufacturing work. He writes about how industrial AI is used in mine-to-mill operations and production planning, drawing on NTWIST's deployment results and its engineering and sales teams.

He is a three-time TEDx speaker and is known in India's green entrepreneurship space. A lawyer by training with a BBA LLB (Hons.) degree, he also wrote Bleeding Markets, a beginner-friendly book on finance.

LinkedIn: Pramodh Chandrashekar