Skip to content

Are Overtime, Backlogs, and Missed Deadlines Killing Your Plant’s Performance?


In 5 minutes, benchmark your plant against industry leaders and pinpoint where inefficiencies are hiding.


Backed by Companies Who Turn Production Planning Into a Competitive Edge

Logo of Canadian Natural Resources Limited — black and blue yin-yang style droplet with a maple leaf inside.
Logo of Puratos, a global food manufacturing company specializing in bakery, patisserie, and chocolate solutions.
Logo of TAQA, an industrial manufacturing company known for innovation in energy and production efficiency.
Logo of OceanaGold Corporation — black silhouette of a miner’s head with gold
Logo of Aura Minerals — lowercase
Logo of Vale S.A. — stylized green and yellow “V” symbol with
Logo of Sherritt International — bold blue “sherritt” in all lowercase letters.
Logo of Gold Fields Limited — gold and navy crest featuring a lion head with

When Your Production Plans Fail, Everything Suffers

Overtime doesn’t just happen. Backlogs don’t just appear. Customers don’t walk away without a reason. All of it ties back to fragile planning that can’t keep up with real-world shocks.

Payroll and overtime files with calculator, showing how constant schedule changes drive overtime costs.

When Every Change Means More Overtime

Schedules crack → the floor scrambles → overtime becomes the band-aid. Costs climb while margins shrink, all because the plan couldn’t adapt fast enough.

Overwhelmed manager surrounded by papers, representing production backlogs and bottlenecks piling up.

Small Delays Snowball Into Big Backlogs

One late job clogs the line, orders pile up, and suddenly the whole plant is behind. Static schedules can’t reshuffle fast enough, leaving managers fighting fires instead of staying on track.

Missed delivery deadlines shown by a worker standing in an empty truck, highlighting risks to customer trust.

Missed Dates Erode Customer Trust

Fragile plans don’t just hurt the shop floor, they put delivery promises at risk. Missed On-Time-In-Full (OTIF) commitments frustrate customers and weaken confidence in your plant.

Overtime Spiral

Backlogs Piling Up

Missed Deadlines

The Checklist Exposes 3 Critical Gaps in Your Scheduling

Hidden Capacity

Overtime, idle machines, and firefighting eat into throughput. See where untapped hours can be reclaimed without adding new assets.

Delivery Risks

Fragile schedules lead to missed dates and unhappy customers. Identify where OTIF commitments are most at risk before they break trust.

Profit Leaks

Manual fixes, rework, and bottlenecks quietly erode margins. Spot the hidden inefficiencies draining your bottom line.

Stop Guessing. Start Measuring.

Every missed deadline or margin slip ties back to fragile planning. This checklist gives you a quick, practical way to measure planning health, so you can fix issues before they snowball into bigger problems.

From Backlogs to Breakthroughs: Results Others Achieved

Across industries, manufacturers have used NTWIST’s production planning approach to uncover hidden capacity, cut overtime, and hit delivery targets with confidence. These aren’t abstract numbers. They’re real results achieved by plants facing the same daily pressures you do.

Case study document highlighting NTWIST’s results for Puratos, showing 29% throughput lift in food manufacturing with zero infrastructure change.

From Planning Headaches to 29% More Throughput in 45 Days

Puratos, a global food manufacturer, was bogged down by manual planning, daily firefighting, and constant debates between planners and production managers. Static spreadsheets left them unsure whether customer demand could actually be met.

By shifting to NTWIST’s planning approach, they created a living plan that adjusted to real-world shocks. Within weeks, the results were clear.

Within Weeks, the Results Were Clear:

0 %
more throughput on existing assets
0 %
OTIF in under two months
0 %
less time rebuilding plans
0 Days
to see ROI

Stop Guessing Why Your Plans Fail. Find Out in 5 Minutes.

Answer 10 quick questions and see if overtime, backlogs, and missed deliveries are symptoms of fragile planning. The checklist gives you a clear snapshot of your planning health — fast, practical, and free.